Sharp Chula Vista Medical Center SPC/NPC Upgrades
751 Medical Center Court, Chula Vista, CA 91911
Remodel and Renovation I 5 Stories I Type I-A Construction
Size 198,000 square feet
Construction Cost $100 million
Relevant Highlights Seismic design for SPC 4D requirements
Seismic design for NPC 4D requirements
Storage tank design for NPC 5 requirements
ADA upgrades
Electrical system replacement and phasing
Chiller replacement
Fire pump replacement
Phased work to continue hospital operations
Permitting required from both HCAI and the City of Chula Vista
This project aims to provide all necessary upgrades to bring the Sharp Chula Vista Medical Center Campus into compliance with all HCAI seismic requirements. The project will deliver plan submittals in accordance with the 2026 deadline for construction documents.
Project Scope The project involves all work necessary for the upgrade of the East and West Towers at SCVMC to make them compliant for acute care beyond the 2030 HCAI deadline. Work includes:
Structural upgrades to the East Tower to comply with SPC 4D standards for performance of the building in a seismic event
Seismic bracing of existing above ceiling utilities in the East Tower in critical care spaces
Seismic anchorage of all equipment in the East Tower in critical care spaces
Seismic bracing of sprinkler piping in the East and West Towers
ADA upgrades to the path of travel in the areas of work
Complete replacement of the main electrical system of the East Tower, including the segregation of emergency systems into critical, life-safety, and equipment branches
Addition of new chiller in the Ocean View Tower and piping connections back the East Tower
Addition of four underground potable water tanks in front of the West Tower
Addition of two underground wastewater tanks along Medical Center Court
New pump utility enclosure
New surface upgrades above the new water storage tanks
Repair and phasing design for all seismic upgrade work